久久影视这里只有精品国产,激情五月婷婷在线,久久免费视频二区,最新99国产小视频

        • 回答數(shù)

          4

        • 瀏覽數(shù)

          127

        ronghuiguantong
        首頁 > 工程師考試 > 冶金煉鋼工程師考試題庫

        4個回答 默認(rèn)排序
        • 默認(rèn)排序
        • 按時間排序

        tonyxiaozb

        已采納

        目前注冊冶金工程師考試在籌備中,不能考……之前有過一批試點(diǎn)

        冶金煉鋼工程師考試題庫

        278 評論(14)

        穿風(fēng)衣的貓2012

        一.詞組漢譯英(任選10個詞組作為一道詞組漢譯英題目,每題2分).1.煉鋼 2.高溫 3.熟鐵 4.平爐 5.木炭 6.. 爐腹 7.鐵溝 8.鋼廠 9.高爐 10.熔池 11.風(fēng)量 12.石灰 13.脈石 14.球團(tuán)礦 15.噴水 16.連鑄系統(tǒng) 17.資金18.鑄坯 19. 鐵水 20.合金答案:1. steelmaking temperature iron 7. iron runner plant furnace volume 15、water spray system metal 二、選擇題(任選10題,每題2分) is ( A ) of the most widely used the case of red iron ore,the compound of iron and oxygen(C ) not so “tight”. and oxygen atoms are very closely( A ) with each other in sponge iron was( B )in bloomery hearths iron consists( B )the element iron combined with numerous other chemical elements, 1709,Abraham Darby,a young man succeeded in( A ) iron with earth( B ) a large number of metals which are useful to of the most important of these is industry ( B )considerable quantities of this metal,either in the form of iron or the form of five of these elements must either be removed almost entirely or at( B )reduced drastically in steelmaking processes are ( C )into two general classes from the chemical point of primary( A )between the two methods of steelmaking is that phosphorus and sulphur can only be removed effectively from the metal under a cover of basic slag is ( C ) and the copper is stirred with tree is a critical operation in which the aim is( A)the oxygen content down to bring pitch copper oxygen and is very ( B)for the copper is over-poled it must be re-( C)and is usually(B)by is the process of shaping metal in a maching( B) rolling or cold forging means( B) cold-rolled or hot-rolled sheets between two press you wake up in the moring rested after a good night’s(A )you look at your watch to see the street car which (B)you to school or to work gets its power from the heavily charged trolley wires 21.The important traits of steel,such as a high melting point,high specific heat,and low heat conductivity,are factors ( A ) the difficulty in continuous steel casting of rounds is quite ( B ) at . limiting . The refining of steel by Bessemer and open-hearth processes removes impurities( B)pig iron by the oxygen of the . Most of the impurities( B )taken into the . Bessemer himself had envisaged the use of oxygen but of course he( D )not obtain sufficient C had . In the 1960s steel-making ( C )a leap react with( B )sand or lime to form a slag which is removed continuous casting of steel has been difficult to ( A). performed alloy steels with under 10 percent of added elements and high alloy steels( A )over 10 percent of added alloying elements modify the effect of the ( B). 三、將以下單詞填入空白處(任選一題作為填空題,每空2分)?!?》 notch support mould bleeders undertaken ceramic skimmer double plug furnace is built on o foundation of pilings and concrete to( support ) the furnace and the iron notch is the slag ( notch ). the bosh and lower stack usually has a ( ceramic ) design of the cooling system and refractory should be (undertaken ) charge is hoisted to the top of the furnace and dumped on to a ( double )bell and hopper arrangement . slag will float on the iron and is separated from the iron by the ( skimmer )in the mudgun is used to (plug )the taphole at the end of the the top of the uptakes are a series of pressure relief valves called ( bleeders ). refining is generally ( applied )after the refining metal is also cast into ( mould )in the vaccum chamber.答案:《2》 metallurgical partly hydrogen sponge iron ore gas seal legs equipment undergo blast furnace takes place the direct reduction process,which is the great improvement in the( metallurgical ) gas reduction process,reducing gases are carbon monoxide,( hydrogen )and shaft-furnace process plays an important part in ( gas ) reduction main component of the MIdrex process are the shaft furnace,the gas( reformer ),and the cooling-gas cooled DRI is continuously discharged through ( seal legs ) at the bottom of the kiln furnace is important ( equipment ) used solid reducing outcome of all direct reduction techniques is ( sponge iron ). reduction thechology usually produces hot metal from( ore )without gases only ( partly) escape while the steel lowers the ability of steels to (undergo)deep drawing operations.四、英譯漢(單詞2分一個,任選5個作為一題)○1ironmaking ○2belt ○3slab ○4blast furnace ○5slag pit ○6spring○7green pellet ○8limestone ○9BOF ○10belly ○11preheat ○12burden ○13oxgen lance○14ladle ○15DRI ○16EAF ○ ○ ○ glass ○答案:1.煉鐵 2.皮帶 3.板坯 4.高爐 5.渣池 6.彈簧 7.生球 8.石灰石 9.堿性氧氣轉(zhuǎn)爐 10.爐腰 11.預(yù)熱 12.爐料 13.氧槍 14.鋼包 15.直接還原鐵 16.電弧爐 17.氧氣 18.參數(shù) 19.水玻璃 20. 鐵合金五.將以下句子翻譯成中文。(任選5個作為一題,每題6分)1. After its inventors,it was also known as the Siemens-Martin process(or open hearth process).2. As the demand for high quality steels increased,post-treatment became a routine step in the production of . The portion of the ore that is too fine to be charged directly into blast furnace is usually . The molten slag usually goes directly to slag pits adjacent to the casthouse, where it is cooled with water . The checker chamber is packed bricks which provide many small,vertically aligned flues for the high temperature . The deoxidization products settle out in the slag.答案:1.依據(jù)它的發(fā)明者的名字命名,就叫做西門子-馬丁工藝(平爐工藝)。2. 隨著對高質(zhì)量鋼需求的增長,爐外精煉已成為當(dāng)今煉鋼過程中必不可少的步驟。3. 礦石中很細(xì)小的顆粒不能直接裝入高爐,通常需要燒結(jié)成塊狀。4. 熔渣通常直接送到出鐵場附近的渣池,在那里用水噴射冷卻。5. 蓄熱室是用格子磚堆砌而成,它能提供許多直徑比較小的高溫氣體直通管。6. 脫氧產(chǎn)物進(jìn)入渣中。

        95 評論(12)

        小開心文文

        你好! 我弟弟高考要選專業(yè)了,我想了解下應(yīng)屆生 冶金工程專業(yè)的就業(yè)和待遇怎么樣。希望得到你的幫助 在此謝謝!

        163 評論(11)

        lincolnsuper

        勘察設(shè)計(jì)注冊冶金工程師,是指經(jīng)考試取得《中華人民共和國勘察設(shè)計(jì)注冊冶金工程師資格證書》,并依法注冊取得《中華人民共和國勘察設(shè)計(jì)注冊冶金工程師注冊執(zhí)業(yè)證書》和執(zhí)業(yè)印章,從事冶金專業(yè)工程設(shè)計(jì)及相關(guān)業(yè)務(wù)的專業(yè)技術(shù)人員。 有金屬冶煉、金屬材料、焦化和耐火材料三個方向。

        111 評論(13)

        相關(guān)問答